Solar plant: site data

Solar power plant in Zabaryne, Berestynskyi Raion, Kharkiv Oblast

Zabaryne: 1,148 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.5% above the oblast median (1,142). #121 of 208 in the rayon, #463 of 1769 in the oblast.

Berestyn, the rayon centre, is 23 km away. 86 m above sea level. 23 km away: Berestyn, the nearest bigger centre, 1,158 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Полтава, 79 km. 11.09 m between rows, pitch 14.96 m (latitude 49.2°).

Yield of 1 kWp
1,148kWh/year
Tilt
36°2° east of south
10 kW
11,483kWh/year
Row pitch
14.96m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Zabaryne

The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 79 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan53Feb90Mar115Apr138May144Jun149Jul148Aug120Sep87Oct41Nov26Dec

July: 149 kWh/kWp, December: 26 — 5.7 times less.

December: 26 against 24 in the oblast, 8.3% more.

Zabaryne: plants, kWh
kWpA yearJulyDecember
55,742745130
1011,4831,490260
1517,2252,235390

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berestynskyi RaionKharkiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.