Solar plant: site data

Solar power plant in Paraskoviia, Berestynskyi Raion, Kharkiv Oblast

Paraskoviia: 1,151 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.8% above the oblast median (1,142). #73 of 208 in the rayon, #310 of 1769 in the oblast.

Berestyn, the rayon centre, is 35 km away. 126 m above sea level. 35 km away: Berestyn, the nearest bigger centre, 1,158 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Харків, 59 km. 11.64 m between rows, pitch 15.46 m (latitude 49.5°).

Yield of 1 kWp
1,151kWh/year
Tilt
37°1° east of south
10 kW
11,513kWh/year
Row pitch
15.46m · GCR 0.31
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Paraskoviia

The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Харків, 59 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan57Feb96Mar115Apr136May143Jun148Jul146Aug119Sep85Oct42Nov24Dec

July: 148 kWh/kWp, December: 24 — 6.2 times less.

January: 41 against 39 in the oblast, 5.1% more.

Paraskoviia: plants, kWh
kWpA yearJulyDecember
55,757740120
1011,5131,480240
1517,2702,220360

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks