Solar plant: site data
Solar power plant in Melykhivka, Berestynskyi Raion, Kharkiv Oblast
Melykhivka: 1,146 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,142). #170 of 208 in the rayon, #649 of 1769 in the oblast.
Berestyn, the rayon centre, is 40 km away. 119 m above sea level. 40 km away: Berestyn, the nearest bigger centre, 1,158 — 1.1% less here. Snow and wind from the nearest regional centre in the DBN — Харків, 54 km. 11.67 m between rows, pitch 15.49 m (latitude 49.5°).
- Yield of 1 kWp
- 1,146kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,458kWh/year
- Row pitch
- 15.49m · GCR 0.31
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,600 / 430Pa
Ground frame designer
A ground frame for a solar plant: Melykhivka
The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Харків, 54 km: snow 1,600 Pa, wind 430 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 148 kWh/kWp, December: 24 — 6.2 times less.
November: 42 against 40 in the oblast, 5.0% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,729 | 740 | 120 |
| 10 | 11,458 | 1,480 | 240 |
| 15 | 17,187 | 2,220 | 360 |
Example: a 10 kW ground frame
For the loads of Kharkiv: 11.16 kWp, 18 panels, 359 kg of steel, 12 piles, materials ≈ 53,991 UAH.
How these numbers are computed
Nearby
- Paraskoviia5 km1,151 kWh/kWp
- Okhoche6 km1,146 kWh/kWp
- Klynove8 km1,148 kWh/kWp
- Lozova9 km1,146 kWh/kWp
- Stulepivka10 km1,145 kWh/kWp
- Muravlynka10 km1,153 kWh/kWp
All places: Berestynskyi RaionKharkiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.