Solar plant: site data
Solar power plant in Zelena, Nadvirnianskyi Raion, Ivano-Frankivsk Oblast
Zelena: 1,031 kWh per kWp a year, tilt 39° 10° east of south (PVGIS). 6.0% below the oblast median (1,097). #42 of 58 in the rayon, #650 of 700 in the oblast.
Nadvirna, the rayon centre, is 21 km away. 626 m above sea level — above 500 m the DBN snow and wind are higher. 21 km away: Nadvirna, the nearest bigger centre, 1,085 — 5.0% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 51 km. 11.34 m between rows, pitch 15.06 m (latitude 48.5°).
- Yield of 1 kWp
- 1,031kWh/year
- Tilt
- 39°10° east of south
- 10 kW
- 10,308kWh/year
- Row pitch
- 15.06m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Zelena
The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 51 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 117 kWh/kWp, December: 41 — 2.9 times less.
May: 107 against 124 in the oblast, 13.7% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,154 | 585 | 205 |
| 10 | 10,308 | 1,170 | 410 |
| 15 | 15,462 | 1,755 | 615 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Bursuchna1 km975 kWh/kWp
- Borsuchna2 km972 kWh/kWp
- Chernyk4 km891 kWh/kWp
- Fenterale4 km1,008 kWh/kWp
- Verpole5 km1,015 kWh/kWp
- Maksymets5 km1,017 kWh/kWp
All places: Nadvirnianskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed