Solar plant: site data
Solar power plant in Yurkuvka, Ivano-Frankivskyi Raion, Ivano-Frankivsk Oblast
Yurkuvka: 1,103 kWh per kWp a year, tilt 38° 1° west of south (PVGIS). 0.6% above the oblast median (1,097). #88 of 244 in the rayon, #256 of 700 in the oblast.
Ivano-Frankivsk, the rayon centre, is 15 km away. 262 m above sea level. 10 km away: Tysmenytsia, the nearest bigger centre, the same 1,105. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 16 km. 11.46 m between rows, pitch 15.23 m (latitude 49.0°).
- Yield of 1 kWp
- 1,103kWh/year
- Tilt
- 38°1° west of south
- 10 kW
- 11,032kWh/year
- Row pitch
- 15.23m · GCR 0.31
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Yurkuvka
The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 16 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 135 kWh/kWp, December: 35 — 3.9 times less.
November: 44 against 48 in the oblast, 8.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,516 | 675 | 175 |
| 10 | 11,032 | 1,350 | 350 |
| 15 | 16,548 | 2,025 | 525 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Roshniv0 km1,101 kWh/kWp
- Myluvannia2 km1,104 kWh/kWp
- Stryhantsi2 km1,099 kWh/kWp
- Vilshanytsia4 km1,102 kWh/kWp
- Bukuvna5 km1,108 kWh/kWp
- Dovhe6 km1,094 kWh/kWp
All places: Ivano-Frankivskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.