Solar power plant in Stryhantsi, Ivano-Frankivskyi Raion, Ivano-Frankivsk Oblast
Stryhantsi: 1,099 kWh per kWp a year, tilt 37° 4° west of south (PVGIS). Exactly the oblast median (1,097). #128 of 244 in the rayon, #317 of 700 in the oblast.
Ivano-Frankivsk, the rayon centre, is 17 km away. 224 m above sea level. 12 km away: Tysmenytsia, the nearest bigger centre, 1,105 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 17 km. 11.22 m between rows, pitch 15.04 m (latitude 49.0°).
- Yield of 1 kWp
- 1,099kWh/year
- Tilt
- 37°4° west of south
- 10 kW
- 10,989kWh/year
- Row pitch
- 15.04m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Stryhantsi
The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 17 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 136 kWh/kWp, December: 33 — 4.1 times less.
December: 33 against 38 in the oblast, 13.2% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,495 | 680 | 165 |
| 10 | 10,989 | 1,360 | 330 |
| 15 | 16,484 | 2,040 | 495 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Roshniv2 km1,101 kWh/kWp
- Yurkuvka2 km1,103 kWh/kWp
- Dovhe3 km1,094 kWh/kWp
- Myluvannia4 km1,104 kWh/kWp
- Mariyampil5 km1,104 kWh/kWp
- Ustya-Zelene5 km1,108 kWh/kWp
All places: Ivano-Frankivskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.