Solar plant: site data
Solar power plant in Verkhnii Maidan, Nadvirnianskyi Raion, Ivano-Frankivsk Oblast
Verkhnii Maidan: 1,091 kWh per kWp a year, tilt 39° 4° east of south (PVGIS). 0.5% below the oblast median (1,097). #16 of 58 in the rayon, #431 of 700 in the oblast.
Nadvirna, the rayon centre, is 7 km away. 460 m above sea level. 7 km away: Nadvirna, the nearest bigger centre, 1,085 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 34 km. 11.40 m between rows, pitch 15.12 m (latitude 48.6°).
- Yield of 1 kWp
- 1,091kWh/year
- Tilt
- 39°4° east of south
- 10 kW
- 10,914kWh/year
- Row pitch
- 15.12m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Verkhnii Maidan
The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 34 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 127 kWh/kWp, December: 42 — 3.0 times less.
December: 42 against 38 in the oblast, 10.5% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,457 | 635 | 210 |
| 10 | 10,914 | 1,270 | 420 |
| 15 | 16,371 | 1,905 | 630 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Berëzovets3 km1,091 kWh/kWp
- Krasna5 km1,094 kWh/kWp
- Paryshche6 km1,105 kWh/kWp
- Loieva6 km1,086 kWh/kWp
- Strymba6 km1,088 kWh/kWp
- Kopanka6 km1,100 kWh/kWp
All places: Nadvirnianskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.