Solar plant: site data
Solar power plant in Myslivka, Kaluskyi Raion, Ivano-Frankivsk Oblast
Myslivka: 973 kWh per kWp a year, tilt 36° 6° east of south (PVGIS). 11.3% below the oblast median (1,097). #159 of 162 in the rayon, #689 of 700 in the oblast.
Kalush, the rayon centre, is 51 km away. 667 m above sea level — above 500 m the DBN snow and wind are higher. 51 km away: Kalush, the nearest bigger centre, 1,086 — 10.4% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 70 km. 10.79 m between rows, pitch 14.66 m (latitude 48.8°).
- Yield of 1 kWp
- 973kWh/year
- Tilt
- 36°6° east of south
- 10 kW
- 9,732kWh/year
- Row pitch
- 14.66m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Myslivka
The designer opens with this place’s coordinates, latitude 48.8° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 70 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 119 kWh/kWp, December: 30 — 4.0 times less.
December: 30 against 38 in the oblast, 21.1% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 4,866 | 595 | 150 |
| 10 | 9,732 | 1,190 | 300 |
| 15 | 14,598 | 1,785 | 450 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Vyshkiv11 km1,021 kWh/kWp
- Novyi Mizun12 km1,035 kWh/kWp
- Senechiv13 km1,015 kWh/kWp
- Pidlisky13 km1,027 kWh/kWp
- Pshenychnyky14 km1,053 kWh/kWp
- Anhelivka14 km1,055 kWh/kWp
All places: Kaluskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.