Novyi Mizun: 1,035 kWh per kWp a year, tilt 38° 6° east of south (PVGIS). 5.6% below the oblast median (1,097). #141 of 162 in the rayon, #644 of 700 in the oblast.
Kalush, the rayon centre, is 42 km away. 509 m above sea level — above 500 m the DBN snow and wind are higher. 41 km away: Stryi, the nearest bigger centre, 1,085 — 4.6% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 64 km. 11.38 m between rows, pitch 15.15 m (latitude 48.9°).
- Yield of 1 kWp
- 1,035kWh/year
- Tilt
- 38°6° east of south
- 10 kW
- 10,352kWh/year
- Row pitch
- 15.15m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Novyi Mizun
The designer opens with this place’s coordinates, latitude 48.9° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 64 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 119 kWh/kWp, December: 35 — 3.4 times less.
May: 109 against 124 in the oblast, 12.1% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,176 | 595 | 175 |
| 10 | 10,352 | 1,190 | 350 |
| 15 | 15,528 | 1,785 | 525 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Pshenychnyky2 km1,053 kWh/kWp
- Novoshyn4 km1,066 kWh/kWp
- Staryi Mizun5 km1,063 kWh/kWp
- Kropyvnyk5 km1,059 kWh/kWp
- Shevchenkove6 km1,061 kWh/kWp
- Anhelivka7 km1,055 kWh/kWp
All places: Kaluskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.