Solar plant: site data
Solar power plant in Ivano-Frankivsk-16, Nadvirnianskyi Raion, Ivano-Frankivsk Oblast
Ivano-Frankivsk-16: 1,059 kWh per kWp a year, tilt 40° 10° east of south (PVGIS). 3.4% below the oblast median (1,097). #34 of 58 in the rayon, #598 of 700 in the oblast.
Nadvirna, the rayon centre, is 14 km away. 583 m above sea level — above 500 m the DBN snow and wind are higher. 14 km away: Nadvirna, the nearest bigger centre, 1,085 — 2.4% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 47 km. 11.57 m between rows, pitch 15.23 m (latitude 48.5°).
- Yield of 1 kWp
- 1,059kWh/year
- Tilt
- 40°10° east of south
- 10 kW
- 10,591kWh/year
- Row pitch
- 15.23m · GCR 0.31
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Ivano-Frankivsk-16
The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 47 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 115 kWh/kWp, December: 49 — 2.3 times less.
December: 49 against 38 in the oblast, 28.9% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,296 | 575 | 245 |
| 10 | 10,591 | 1,150 | 490 |
| 15 | 15,886 | 1,725 | 735 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Delyatyn7 km1,078 kWh/kWp
- Yaremche7 km1,040 kWh/kWp
- Postoyata8 km1,061 kWh/kWp
- Loieva8 km1,086 kWh/kWp
- Zarichchia8 km1,078 kWh/kWp
- Bilozoryna8 km1,076 kWh/kWp
All places: Nadvirnianskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.