Solar plant: site data
Solar power plant in Havrylivka, Nadvirnianskyi Raion, Ivano-Frankivsk Oblast
Havrylivka: 1,106 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 0.8% above the oblast median (1,097). #2 of 58 in the rayon, #226 of 700 in the oblast.
Nadvirna, the rayon centre, is 13 km away. 356 m above sea level. 13 km away: Nadvirna, the nearest bigger centre, 1,085 — 1.9% more here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 25 km. 11.47 m between rows, pitch 15.19 m (latitude 48.7°).
- Yield of 1 kWp
- 1,106kWh/year
- Tilt
- 39°2° east of south
- 10 kW
- 11,055kWh/year
- Row pitch
- 15.19m · GCR 0.31
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Havrylivka
The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 25 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 130 kWh/kWp, December: 43 — 3.0 times less.
December: 43 against 38 in the oblast, 13.2% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,528 | 650 | 215 |
| 10 | 11,055 | 1,300 | 430 |
| 15 | 16,583 | 1,950 | 645 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Paryshche4 km1,105 kWh/kWp
- Hlynky4 km1,107 kWh/kWp
- Zhebrach5 km1,105 kWh/kWp
- Volosiv6 km1,105 kWh/kWp
- Vynohrad6 km1,111 kWh/kWp
- Serednii Maidan6 km1,096 kWh/kWp
All places: Nadvirnianskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.