Solar plant: site data
Solar power plant in Bukove, Nadvirnianskyi Raion, Ivano-Frankivsk Oblast
Bukove: 1,018 kWh per kWp a year, tilt 37° 6° east of south (PVGIS). 7.2% below the oblast median (1,097). #44 of 58 in the rayon, #663 of 700 in the oblast.
Nadvirna, the rayon centre, is 15 km away. 674 m above sea level — above 500 m the DBN snow and wind are higher. 15 km away: Nadvirna, the nearest bigger centre, 1,085 — 6.2% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 43 km. 10.90 m between rows, pitch 14.72 m (latitude 48.6°).
- Yield of 1 kWp
- 1,018kWh/year
- Tilt
- 37°6° east of south
- 10 kW
- 10,180kWh/year
- Row pitch
- 14.72m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Bukove
The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 43 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 116 kWh/kWp, December: 35 — 3.3 times less.
May: 108 against 124 in the oblast, 12.9% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,090 | 580 | 175 |
| 10 | 10,180 | 1,160 | 350 |
| 15 | 15,270 | 1,740 | 525 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Boiky4 km1,050 kWh/kWp
- Pasichna5 km1,051 kWh/kWp
- Fenterale6 km1,008 kWh/kWp
- Maniava6 km1,055 kWh/kWp
- Bursuchna8 km975 kWh/kWp
- Bytkiv8 km1,072 kWh/kWp
All places: Nadvirnianskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.