Solar plant: site data
Solar power plant in Bratkivtsi, Ivano-Frankivskyi Raion, Ivano-Frankivsk Oblast
Bratkivtsi: 1,107 kWh per kWp a year, tilt 38° facing south (PVGIS). 0.9% above the oblast median (1,097). #61 of 244 in the rayon, #220 of 700 in the oblast.
Ivano-Frankivsk, the rayon centre, is 12 km away. 289 m above sea level. 12 km away: Ivano-Frankivsk, the nearest bigger centre, 1,095 — 1.1% more here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 12 km. 11.32 m between rows, pitch 15.09 m (latitude 48.8°).
- Yield of 1 kWp
- 1,107kWh/year
- Tilt
- 38°facing south
- 10 kW
- 11,065kWh/year
- Row pitch
- 15.09m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Bratkivtsi
The designer opens with this place’s coordinates, latitude 48.8° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 12 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 133 kWh/kWp, December: 39 — 3.4 times less.
November: 46 against 48 in the oblast, 4.2% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,533 | 665 | 195 |
| 10 | 11,065 | 1,330 | 390 |
| 15 | 16,598 | 1,995 | 585 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Berezivka3 km1,107 kWh/kWp
- Lypivka3 km1,115 kWh/kWp
- Mel’niki3 km1,112 kWh/kWp
- Cherniiv5 km1,098 kWh/kWp
- Nova Lypivka5 km1,114 kWh/kWp
- Zaberezhe6 km1,102 kWh/kWp
All places: Ivano-Frankivskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.