Spain: solar plant site data

Solar power plant in San Vicente del Raspeig, Spain: yield, tilt angle and row spacing

San Vicente del Raspeig: 1,704 kWh per kWp a year at the optimal tilt of 36°, 1° east of south (PVGIS). 5.5% above the median of the main cities of Spain (1,615). #19 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 53.0% more here.

San Vicente del Raspeig is in the province of Alicante, Valencian Community. Population 56,715 (GeoNames). 113 m above sea level. 7 km away: Alicante, the nearest bigger city, 1,614 kWh/kWp — 5.6% more here. 6.03 m between rows, pitch 9.90 m, GCR 0.48 (latitude 38.4°).

Yield of 1 kWp
1,704kWh/year
Tilt
36°1° east of south
10 kW
17,043kWh/year
Row pitch
9.90m · GCR 0.48
Rank in the country
19of 147 cities

Ground frame designer

A ground frame for a solar plant: San Vicente del Raspeig

Latitude 38.4°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

124Jan121Feb145Mar150Apr162May160Jun167Jul164Aug145Sep136Oct115Nov114Dec

July: 167 kWh/kWp, December: 114 — 1.5 times less.

January: 124 against the median of 109 for the main cities of Spain, 13.8% more.

San Vicente del Raspeig: plants, kWh
kWpA yearJulyDecember
58,522835570
1017,0431,6701,140
1525,5652,5051,710

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.