Spain: solar plant site data

Solar power plant in Alicante, Spain: yield, tilt angle and row spacing

Alicante: 1,614 kWh per kWp a year at the optimal tilt of 35°, 7° west of south (PVGIS). Exactly the median of the main cities of Spain (1,615). #77 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 44.8% more here.

Alicante is in the province of Alicante, Valencian Community. Population 348,901 (GeoNames). 18 m above sea level. 69 km away: Murcia, the nearest bigger city, 1,630 kWh/kWp — 1.0% less here. 5.87 m between rows, pitch 9.79 m, GCR 0.49 (latitude 38.3°).

Yield of 1 kWp
1,614kWh/year
Tilt
35°7° west of south
10 kW
16,135kWh/year
Row pitch
9.79m · GCR 0.49
Rank in the country
77of 147 cities

Ground frame designer

A ground frame for a solar plant: Alicante

Latitude 38.3°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

111Jan111Feb137Mar144Apr157May157Jun164Jul161Aug139Sep128Oct103Nov101Dec

July: 164 kWh/kWp, December: 101 — 1.6 times less.

September: 139 against the median of 143 for the main cities of Spain, 2.8% less.

Alicante: plants, kWh
kWpA yearJulyDecember
58,068820505
1016,1351,6401,010
1524,2032,4601,515

Fixed tilt facing south

What a table yields at another tilt than the optimal 35° — for roofs and frames with a standard slope.

Alicante: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
35° (optimum)1,614—
15°1,535−4.9%
30°1,606−0.5%
45°1,591−1.4%
90°1,026−36.4%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.