Spain: solar plant site data

Solar power plant in Oviedo, Spain: yield, tilt angle and row spacing

Oviedo: 1,202 kWh per kWp a year at the optimal tilt of 38°, 4° east of south (PVGIS). 25.6% below the median of the main cities of Spain (1,615). #140 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 7.9% more here.

Oviedo is in Asturias. Population 220,027 (GeoNames). 237 m above sea level. 24 km away: Gijón, the nearest bigger city, 1,181 kWh/kWp — 1.8% more here. 8.08 m between rows, pitch 11.85 m, GCR 0.40 (latitude 43.4°).

Yield of 1 kWp
1,202kWh/year
Tilt
38°4° east of south
10 kW
12,019kWh/year
Row pitch
11.85m · GCR 0.40
Rank in the country
140of 147 cities

Ground frame designer

A ground frame for a solar plant: Oviedo

Latitude 43.4°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

74Jan85Feb109Mar114Apr117May107Jun117Jul120Aug115Sep100Oct73Nov71Dec

August: 120 kWh/kWp, December: 71 — 1.7 times less.

January: 74 against the median of 109 for the main cities of Spain, 32.1% less.

Oviedo: plants, kWh
kWpA yearAugustDecember
56,010600355
1012,0191,200710
1518,0291,8001,065

Fixed tilt facing south

What a table yields at another tilt than the optimal 38° — for roofs and frames with a standard slope.

Oviedo: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
38° (optimum)1,202—
15°1,130−6.0%
30°1,192−0.8%
45°1,195−0.6%
90°843−29.9%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.