Spain: solar plant site data
Solar power plant in Mijas, Spain: yield, tilt angle and row spacing
Mijas: 1,620 kWh per kWp a year at the optimal tilt of 33°, 19° east of south (PVGIS). Exactly the median of the main cities of Spain (1,615). #68 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 45.4% more here.
Mijas is in the province of Málaga, Andalusia. Population 80,630 (GeoNames). 418 m above sea level. 24 km away: Málaga, the nearest bigger city, 1,698 kWh/kWp — 4.6% less here. 5.16 m between rows, pitch 9.17 m, GCR 0.52 (latitude 36.6°).
- Yield of 1 kWp
- 1,620kWh/year
- Tilt
- 33°19° east of south
- 10 kW
- 16,199kWh/year
- Row pitch
- 9.17m · GCR 0.52
- Rank in the country
- 68of 147 cities
Ground frame designer
A ground frame for a solar plant: Mijas
Latitude 36.6°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 169 kWh/kWp, December: 95 — 1.8 times less.
December: 95 against the median of 103 for the main cities of Spain, 7.8% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 8,100 | 845 | 475 |
| 10 | 16,199 | 1,690 | 950 |
| 15 | 24,299 | 2,535 | 1,425 |
Snow and wind loads
Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.
The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.
Nearby cities
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation, population and divisions (changed)
- Where to take snow and wind loads from: CTE DB SE-AE
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.