Spain: solar plant site data

Solar power plant in Málaga, Spain: yield, tilt angle and row spacing

Málaga: 1,698 kWh per kWp a year at the optimal tilt of 34°, 2° west of south (PVGIS). 5.1% above the median of the main cities of Spain (1,615). #21 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 52.5% more here.

Málaga is in the province of Málaga, Andalusia. Population 592,346 (GeoNames). 22 m above sea level. 156 km away: Seville, the nearest bigger city, 1,672 kWh/kWp — 1.6% more here. 5.32 m between rows, pitch 9.29 m, GCR 0.51 (latitude 36.7°).

Yield of 1 kWp
1,698kWh/year
Tilt
34°2° west of south
10 kW
16,984kWh/year
Row pitch
9.29m · GCR 0.51
Rank in the country
21of 147 cities

Ground frame designer

A ground frame for a solar plant: Málaga

Latitude 36.7°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

122Jan121Feb143Mar146Apr161May161Jun167Jul165Aug149Sep134Oct115Nov113Dec

July: 167 kWh/kWp, December: 113 — 1.5 times less.

January: 122 against the median of 109 for the main cities of Spain, 11.9% more.

Málaga: plants, kWh
kWpA yearJulyDecember
58,492835565
1016,9841,6701,130
1525,4762,5051,695

Fixed tilt facing south

What a table yields at another tilt than the optimal 34° — for roofs and frames with a standard slope.

Málaga: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
34° (optimum)1,698—
15°1,624−4.4%
30°1,694−0.2%
45°1,675−1.4%
90°1,070−37.0%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.