Spain: solar plant site data

Solar power plant in Girona, Spain: yield, tilt angle and row spacing

Girona: 1,466 kWh per kWp a year at the optimal tilt of 38°, 3° east of south (PVGIS). 9.2% below the median of the main cities of Spain (1,615). #126 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 31.6% more here.

Girona is in the province of Girona, Catalonia. Population 100,266 (GeoNames). 81 m above sea level. 58 km away: Mataró, the nearest bigger city, 1,560 kWh/kWp — 6.0% less here. 7.51 m between rows, pitch 11.28 m, GCR 0.42 (latitude 42.0°).

Yield of 1 kWp
1,466kWh/year
Tilt
38°3° east of south
10 kW
14,662kWh/year
Row pitch
11.28m · GCR 0.42
Rank in the country
126of 147 cities

Ground frame designer

A ground frame for a solar plant: Girona

Latitude 42.0°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

106Jan107Feb126Mar130Apr139May139Jun146Jul142Aug124Sep113Oct95Nov99Dec

July: 146 kWh/kWp, November: 95 — 1.5 times less.

September: 124 against the median of 143 for the main cities of Spain, 13.3% less.

Girona: plants, kWh
kWpA yearJulyNovember
57,331730475
1014,6621,460950
1521,9932,1901,425

Fixed tilt facing south

What a table yields at another tilt than the optimal 38° — for roofs and frames with a standard slope.

Girona: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
38° (optimum)1,466—
15°1,368−6.7%
30°1,452−1.0%
45°1,459−0.5%
90°1,014−30.9%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.