Spain: solar plant site data

Solar power plant in Castellon, Spain: yield, tilt angle and row spacing

Castellon: 1,617 kWh per kWp a year at the optimal tilt of 37°, 2° west of south (PVGIS). Exactly the median of the main cities of Spain (1,615). #70 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 45.2% more here.

Castellon is in the province of Castellón, Valencian Community. Population 183,711 (GeoNames). 30 m above sea level. 64 km away: Valencia, the nearest bigger city, 1,632 kWh/kWp — 0.9% less here. 6.65 m between rows, pitch 10.47 m, GCR 0.46 (latitude 40.0°).

Yield of 1 kWp
1,617kWh/year
Tilt
37°2° west of south
10 kW
16,171kWh/year
Row pitch
10.47m · GCR 0.46
Rank in the country
70of 147 cities

Ground frame designer

A ground frame for a solar plant: Castellon

Latitude 40.0°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

113Jan116Feb139Mar145Apr156May154Jun160Jul155Aug137Sep127Oct108Nov106Dec

July: 160 kWh/kWp, December: 106 — 1.5 times less.

August: 155 against the median of 163 for the main cities of Spain, 4.9% less.

Castellon: plants, kWh
kWpA yearJulyDecember
58,086800530
1016,1711,6001,060
1524,2572,4001,590

Fixed tilt facing south

What a table yields at another tilt than the optimal 37° — for roofs and frames with a standard slope.

Castellon: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
37° (optimum)1,617—
15°1,520−6.0%
30°1,606−0.7%
45°1,606−0.7%
90°1,080−33.2%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.