Spain: solar plant site data

Solar power plant in Cadiz, Spain: yield, tilt angle and row spacing

Cadiz: 1,707 kWh per kWp a year at the optimal tilt of 33°, 3° west of south (PVGIS). 5.7% above the median of the main cities of Spain (1,615). #18 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 53.3% more here.

Cadiz is in the province of Cádiz, Andalusia. Population 116,979 (GeoNames). 22 m above sea level. 22 km away: Jerez de la Frontera, the nearest bigger city, the same 1,711 kWh/kWp. 5.15 m between rows, pitch 9.16 m, GCR 0.52 (latitude 36.5°).

Yield of 1 kWp
1,707kWh/year
Tilt
33°3° west of south
10 kW
17,073kWh/year
Row pitch
9.16m · GCR 0.52
Rank in the country
18of 147 cities

Ground frame designer

A ground frame for a solar plant: Cadiz

Latitude 36.5°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

118Jan120Feb144Mar153Apr165May162Jun171Jul168Aug150Sep134Oct113Nov110Dec

July: 171 kWh/kWp, December: 110 — 1.6 times less.

November: 113 against the median of 103 for the main cities of Spain, 9.7% more.

Cadiz: plants, kWh
kWpA yearJulyDecember
58,537855550
1017,0731,7101,100
1525,6102,5651,650

Fixed tilt facing south

What a table yields at another tilt than the optimal 33° — for roofs and frames with a standard slope.

Cadiz: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
33° (optimum)1,707—
15°1,635−4.2%
30°1,704−0.2%
45°1,680−1.6%
90°1,056−38.2%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.