Solar plant: site data
Solar power plant in Zavydo-Kudasheve, Pokrovskyi Raion, Donetsk Oblast
Zavydo-Kudasheve: 1,156 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). Exactly the oblast median (1,161). #231 of 262 in the rayon, #891 of 1312 in the oblast.
Pokrovsk, the rayon centre, is 27 km away. 116 m above sea level. 27 km away: Pokrovsk, the nearest bigger centre, the same 1,159. Snow and wind from the nearest regional centre in the DBN — Дніпро, 139 km. 10.54 m between rows, pitch 14.41 m (latitude 48.5°).
- Yield of 1 kWp
- 1,156kWh/year
- Tilt
- 36°1° east of south
- 10 kW
- 11,564kWh/year
- Row pitch
- 14.41m · GCR 0.33
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,340 / 470Pa
Ground frame designer
A ground frame for a solar plant: Zavydo-Kudasheve
The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 139 km: snow 1,340 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 149 kWh/kWp, December: 27 — 5.5 times less.
January: 35 against 37 in the oblast, 5.4% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,782 | 745 | 135 |
| 10 | 11,564 | 1,490 | 270 |
| 15 | 17,346 | 2,235 | 405 |
Example: a 10 kW ground frame
For the loads of Dnipro: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Kryvorizhzhya3 km1,159 kWh/kWp
- Raksha3 km1,157 kWh/kWp
- Virivka4 km1,157 kWh/kWp
- Novokryvorizhzhia4 km1,157 kWh/kWp
- Novofedorivka5 km1,158 kWh/kWp
- Zavydo-Borzenka6 km1,158 kWh/kWp
All places: Pokrovskyi RaionDonetsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.