Solar plant: site data
Solar power plants: Donetsk Oblast
PVGIS data cover 1312 of 1312 places: 1 kWp yields from 1,131 kWh a year (Lisne) to 1,289 (Yalta), median 1,161 kWh/kWp at an optimal tilt of about 36°. That is 2.3% more than the median of Ukraine — 1,135 kWh/kWp.
- Median yield
- 1,161kWh/year
- From — to
- 1,131–1,289kWh/year
- Optimal tilt
- 36°median
- Places with PVGIS data
- 1,312of 1312
Ground frame designer
A ground frame for a solar plant: Donetsk Oblast
The designer opens with latitude 48.0° and the DBN loads of the nearest regional centre — Запоріжжя: snow 1,110 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Rayons
| Rayon | Places | Median, kWh/kWp | From — to |
|---|---|---|---|
| Bakhmutskyi Raion | 101 | 1,150 | 1,142–1,157 |
| Volnovaskyi Raion | 161 | 1,177 | 1,166–1,207 |
| Horlivskyi Raion | 130 | 1,154 | 1,146–1,165 |
| Donetskyi Raion | 157 | 1,163 | 1,131–1,177 |
| Kalmiuskyi Raion | 174 | 1,184 | 1,164–1,267 |
| Kramatorskyi Raion | 233 | 1,152 | 1,138–1,182 |
| Mariupolskyi Raion | 94 | 1,225 | 1,183–1,289 |
| Pokrovskyi Raion | 262 | 1,160 | 1,153–1,176 |
Towns and rayon centres
| Place | Rayon | kWh/kWp | Tilt |
|---|---|---|---|
| Bakhmut | Bakhmutskyi Raion | 1,146 | 36° |
| Boykivske | Kalmiuskyi Raion | 1,189 | 35° |
| Donetsk | Donetskyi Raion | 1,170 | 36° |
| Horlivka | Horlivskyi Raion | 1,154 | 36° |
| Kramatorsk | Kramatorskyi Raion | 1,149 | 36° |
| Makiyivka | Donetskyi Raion | 1,167 | 36° |
| Mariupol | Mariupolskyi Raion | 1,245 | 36° |
| Pokrovsk | Pokrovskyi Raion | 1,159 | 36° |
| Volnovakha | Volnovaskyi Raion | 1,179 | 35° |
Snow and wind
The nearest regional centre in the DBN — Запоріжжя: S₀ = 1,110 Pa, W₀ = 460 Pa (DBN V.1.2-2:2006). Each place’s page names its own nearest centre and the distance. Snow and wind: Запоріжжя
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.