Solar plant: site data

Solar power plant in Tsukuryne, Pokrovskyi Raion, Donetsk Oblast

Tsukuryne: 1,167 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 0.5% above the oblast median (1,161). #43 of 262 in the rayon, #495 of 1312 in the oblast.

Pokrovsk, the rayon centre, is 24 km away. 201 m above sea level. 24 km away: Pokrovsk, the nearest bigger centre, 1,159 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 163 km. 10.27 m between rows, pitch 14.14 m (latitude 48.1°).

Yield of 1 kWp
1,167kWh/year
Tilt
36°1° east of south
10 kW
11,673kWh/year
Row pitch
14.14m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Tsukuryne

The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 163 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan55Feb92Mar115Apr136May141Jun148Jul150Aug124Sep92Oct48Nov28Dec

August: 150 kWh/kWp, December: 28 — 5.4 times less.

January: 39 against 37 in the oblast, 5.4% more.

Tsukuryne: plants, kWh
kWpA yearAugustDecember
55,837750140
1011,6731,500280
1517,5102,250420

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Pokrovskyi RaionDonetsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.