Solar plant: site data

Solar power plant in Ternove, Horlivskyi Raion, Donetsk Oblast

Ternove: 1,160 kWh per kWp a year, tilt 36° facing south (PVGIS). Exactly the oblast median (1,161). #25 of 130 in the rayon, #715 of 1312 in the oblast.

Horlivka, the rayon centre, is 52 km away. 246 m above sea level. 48 km away: Makiyivka, the nearest bigger centre, 1,167 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 256 km. 10.21 m between rows, pitch 14.08 m (latitude 48.0°).

Yield of 1 kWp
1,160kWh/year
Tilt
36°facing south
10 kW
11,600kWh/year
Row pitch
14.08m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Ternove

The designer opens with this place’s coordinates, latitude 48.0° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 256 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan55Feb88Mar115Apr136May142Jun147Jul149Aug124Sep89Oct47Nov28Dec

August: 149 kWh/kWp, December: 28 — 5.3 times less.

March: 88 against 92 in the oblast, 4.3% less.

Ternove: plants, kWh
kWpA yearAugustDecember
55,800745140
1011,6001,490280
1517,4002,235420

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Horlivskyi RaionDonetsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.