Solar plant: site data

Solar power plant in Saurivka, Horlivskyi Raion, Donetsk Oblast

Saurivka: 1,158 kWh per kWp a year, tilt 35° facing south (PVGIS). Exactly the oblast median (1,161). #33 of 130 in the rayon, #812 of 1312 in the oblast.

Horlivka, the rayon centre, is 70 km away. 151 m above sea level. 50 km away: Rovenky, the nearest bigger centre, the same 1,157. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 270 km. 9.90 m between rows, pitch 13.82 m (latitude 47.9°).

Yield of 1 kWp
1,158kWh/year
Tilt
35°facing south
10 kW
11,581kWh/year
Row pitch
13.82m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Saurivka

The designer opens with this place’s coordinates, latitude 47.9° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 270 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan54Feb87Mar116Apr137May143Jun146Jul150Aug125Sep89Oct46Nov29Dec

August: 150 kWh/kWp, December: 29 — 5.2 times less.

March: 87 against 92 in the oblast, 5.4% less.

Saurivka: plants, kWh
kWpA yearAugustDecember
55,791750145
1011,5811,500290
1517,3722,250435

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Horlivskyi RaionDonetsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.