Solar plant: site data

Solar power plant in Sartana, Mariupolskyi Raion, Donetsk Oblast

Sartana: 1,264 kWh per kWp a year, tilt 36° 3° west of south (PVGIS). 8.8% above the oblast median (1,161). #12 of 94 in the rayon, #13 of 1312 in the oblast.

Mariupol, the rayon centre, is 14 km away. 7 m above sea level. 14 km away: Mariupol, the nearest bigger centre, 1,245 — 1.5% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 205 km. 9.67 m between rows, pitch 13.54 m (latitude 47.2°).

Yield of 1 kWp
1,264kWh/year
Tilt
36°3° west of south
10 kW
12,638kWh/year
Row pitch
13.54m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Sartana

The designer opens with this place’s coordinates, latitude 47.2° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 205 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan64Feb102Mar127Apr147May149Jun156Jul160Aug131Sep98Oct55Nov35Dec

August: 160 kWh/kWp, December: 35 — 4.6 times less.

December: 35 against 28 in the oblast, 25.0% more.

Sartana: plants, kWh
kWpA yearAugustDecember
56,319800175
1012,6381,600350
1518,9572,400525

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mariupolskyi RaionDonetsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.