Solar plant: site data
Solar power plant in Portivske, Mariupolskyi Raion, Donetsk Oblast
Portivske: 1,245 kWh per kWp a year, tilt 35° 4° west of south (PVGIS). 7.2% above the oblast median (1,161). #34 of 94 in the rayon, #54 of 1312 in the oblast.
Mariupol, the rayon centre, is 14 km away. 54 m above sea level. 14 km away: Mariupol, the nearest bigger centre, the same 1,245. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 197 km. 9.33 m between rows, pitch 13.25 m (latitude 47.0°).
- Yield of 1 kWp
- 1,245kWh/year
- Tilt
- 35°4° west of south
- 10 kW
- 12,447kWh/year
- Row pitch
- 13.25m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,110 / 460Pa
Ground frame designer
A ground frame for a solar plant: Portivske
The designer opens with this place’s coordinates, latitude 47.0° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 197 km: snow 1,110 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 160 kWh/kWp, December: 35 — 4.6 times less.
December: 35 against 28 in the oblast, 25.0% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 6,224 | 800 | 175 |
| 10 | 12,447 | 1,600 | 350 |
| 15 | 18,671 | 2,400 | 525 |
Example: a 10 kW ground frame
For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Hlyboke2 km1,245 kWh/kWp
- Rybatske2 km1,232 kWh/kWp
- Chervone2 km1,232 kWh/kWp
- Buryakova Balka4 km1,275 kWh/kWp
- Ohorodnye4 km1,251 kWh/kWp
- Melekyne6 km1,272 kWh/kWp
All places: Mariupolskyi RaionDonetsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.