Solar plant: site data

Solar power plant in Novotroyits’ke, Pokrovskyi Raion, Donetsk Oblast

Novotroyits’ke: 1,166 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). Exactly the oblast median (1,161). #57 of 262 in the rayon, #539 of 1312 in the oblast.

Pokrovsk, the rayon centre, is 33 km away. 196 m above sea level. 31 km away: Kramatorsk, the nearest bigger centre, 1,149 — 1.4% more here. Snow and wind from the nearest regional centre in the DBN — Дніпро, 160 km. 10.63 m between rows, pitch 14.50 m (latitude 48.6°).

Yield of 1 kWp
1,166kWh/year
Tilt
36°1° east of south
10 kW
11,656kWh/year
Row pitch
14.50m · GCR 0.33
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,340 / 470Pa

Ground frame designer

A ground frame for a solar plant: Novotroyits’ke

The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 160 km: snow 1,340 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan55Feb94Mar116Apr139May143Jun148Jul149Aug123Sep90Oct45Nov28Dec

August: 149 kWh/kWp, December: 28 — 5.3 times less.

November: 45 against 47 in the oblast, 4.3% less.

Novotroyits’ke: plants, kWh
kWpA yearAugustDecember
55,828745140
1011,6561,490280
1517,4842,235420

Snow and wind: Дніпро

Example: a 10 kW ground frame

For the loads of Dnipro: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Pokrovskyi RaionDonetsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.