Solar plant: site data

Solar power plant in Novoselivka Druha, Pokrovskyi Raion, Donetsk Oblast

Novoselivka Druha: 1,158 kWh per kWp a year, tilt 36° facing south (PVGIS). Exactly the oblast median (1,161). #209 of 262 in the rayon, #850 of 1312 in the oblast.

Pokrovsk, the rayon centre, is 46 km away. 155 m above sea level. 20 km away: Horlivka, the nearest bigger centre, the same 1,154. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 201 km. 10.36 m between rows, pitch 14.23 m (latitude 48.2°).

Yield of 1 kWp
1,158kWh/year
Tilt
36°facing south
10 kW
11,575kWh/year
Row pitch
14.23m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Novoselivka Druha

The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 201 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan56Feb91Mar114Apr135May141Jun146Jul148Aug123Sep90Oct47Nov28Dec

August: 148 kWh/kWp, December: 28 — 5.3 times less.

January: 39 against 37 in the oblast, 5.4% more.

Novoselivka Druha: plants, kWh
kWpA yearAugustDecember
55,788740140
1011,5751,480280
1517,3632,220420

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Pokrovskyi RaionDonetsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.