Solar plant: site data

Solar power plant in Cherevkivske, Kalmiuskyi Raion, Donetsk Oblast

Cherevkivske: 1,183 kWh per kWp a year, tilt 35° 1° west of south (PVGIS). 1.9% above the oblast median (1,161). #90 of 174 in the rayon, #212 of 1312 in the oblast.

Boykivske, the rayon centre, is 11 km away. 81 m above sea level. 11 km away: Boykivske, the nearest bigger centre, the same 1,189. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 229 km. 9.61 m between rows, pitch 13.53 m (latitude 47.5°).

Yield of 1 kWp
1,183kWh/year
Tilt
35°1° west of south
10 kW
11,834kWh/year
Row pitch
13.53m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Cherevkivske

The designer opens with this place’s coordinates, latitude 47.5° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 229 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb92Mar119Apr138May144Jun150Jul153Aug126Sep93Oct51Nov30Dec

August: 153 kWh/kWp, December: 30 — 5.1 times less.

November: 51 against 47 in the oblast, 8.5% more.

Cherevkivske: plants, kWh
kWpA yearAugustDecember
55,917765150
1011,8341,530300
1517,7512,295450

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kalmiuskyi RaionDonetsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.