Solar plant: site data
Solar power plant in Zaitseve, Synelnykivskyi Raion, Dnipropetrovsk Oblast
Zaitseve: 1,177 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,177). #125 of 370 in the rayon, #727 of 1501 in the oblast.
Synelnykove, the rayon centre, is 16 km away. 144 m above sea level. 16 km away: Synelnykove, the nearest bigger centre, the same 1,178. Snow and wind from the nearest regional centre in the DBN — Дніпро, 46 km. 10.52 m between rows, pitch 14.39 m (latitude 48.4°).
- Yield of 1 kWp
- 1,177kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 11,773kWh/year
- Row pitch
- 14.39m · GCR 0.33
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,340 / 470Pa
Ground frame designer
A ground frame for a solar plant: Zaitseve
The designer opens with this place’s coordinates, latitude 48.4° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 46 km: snow 1,340 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 151 kWh/kWp, December: 28 — 5.4 times less.
January: 34 against 35 in the oblast, 2.9% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,887 | 755 | 140 |
| 10 | 11,773 | 1,510 | 280 |
| 15 | 17,660 | 2,265 | 420 |
Example: a 10 kW ground frame
For the loads of Dnipro: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Kozachyi Hai3 km1,179 kWh/kWp
- Novomatviivske4 km1,177 kWh/kWp
- Kalynivka4 km1,175 kWh/kWp
- Vodiane5 km1,181 kWh/kWp
- Ternove5 km1,175 kWh/kWp
- Nove5 km1,175 kWh/kWp
All places: Synelnykivskyi RaionDnipropetrovsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.