Solar plant: site data

Solar power plant in Ternove, Synelnykivskyi Raion, Dnipropetrovsk Oblast

Ternove: 1,175 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,177). #191 of 370 in the rayon, #898 of 1501 in the oblast.

Synelnykove, the rayon centre, is 21 km away. 139 m above sea level. 14 km away: Pavlohrad, the nearest bigger centre, the same 1,172. Snow and wind from the nearest regional centre in the DBN — Дніпро, 50 km. 10.54 m between rows, pitch 14.41 m (latitude 48.5°).

Yield of 1 kWp
1,175kWh/year
Tilt
36°2° east of south
10 kW
11,748kWh/year
Row pitch
14.41m · GCR 0.33
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,340 / 470Pa

Ground frame designer

A ground frame for a solar plant: Ternove

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 50 km: snow 1,340 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan54Feb94Mar118Apr140May144Jun150Jul151Aug123Sep92Oct47Nov29Dec

August: 151 kWh/kWp, December: 29 — 5.2 times less.

December: 29 against 28 in the oblast, 3.6% more.

Ternove: plants, kWh
kWpA yearAugustDecember
55,874755145
1011,7481,510290
1517,6222,265435

Snow and wind: Дніпро

Example: a 10 kW ground frame

For the loads of Dnipro: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Synelnykivskyi RaionDnipropetrovsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.