Solar plant: site data

Solar power plant in Cherkaske, Samarivskyi Raion, Dnipropetrovsk Oblast

Cherkaske: 1,175 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,177). #18 of 115 in the rayon, #866 of 1501 in the oblast.

Samar, the rayon centre, is 12 km away. 70 m above sea level. 12 km away: Samar, the nearest bigger centre, 1,189 — 1.1% less here. Snow and wind from the nearest regional centre in the DBN — Дніпро, 36 km. 10.98 m between rows, pitch 14.80 m (latitude 48.7°).

Yield of 1 kWp
1,175kWh/year
Tilt
37°2° east of south
10 kW
11,753kWh/year
Row pitch
14.80m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,340 / 470Pa

Ground frame designer

A ground frame for a solar plant: Cherkaske

The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 36 km: snow 1,340 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan60Feb96Mar116Apr139May142Jun147Jul147Aug121Sep89Oct46Nov31Dec

July: 147 kWh/kWp, December: 31 — 4.7 times less.

January: 41 against 35 in the oblast, 17.1% more.

Cherkaske: plants, kWh
kWpA yearJulyDecember
55,877735155
1011,7531,470310
1517,6302,205465

Snow and wind: Дніпро

Example: a 10 kW ground frame

For the loads of Dnipro: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed