Solar plant: site data
Solar power plant in Andriivka, Samarivskyi Raion, Dnipropetrovsk Oblast
Andriivka: 1,165 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.0% below the oblast median (1,177). #39 of 115 in the rayon, #1296 of 1501 in the oblast.
Samar, the rayon centre, is 21 km away. 64 m above sea level. 21 km away: Samar, the nearest bigger centre, 1,189 — 2.0% less here. Snow and wind from the nearest regional centre in the DBN — Дніпро, 45 km. 11.03 m between rows, pitch 14.85 m (latitude 48.8°).
- Yield of 1 kWp
- 1,165kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,649kWh/year
- Row pitch
- 14.85m · GCR 0.32
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,340 / 470Pa
Ground frame designer
A ground frame for a solar plant: Andriivka
The designer opens with this place’s coordinates, latitude 48.8° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 45 km: snow 1,340 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 148 kWh/kWp, December: 29 — 5.1 times less.
January: 40 against 35 in the oblast, 14.3% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,825 | 740 | 145 |
| 10 | 11,649 | 1,480 | 290 |
| 15 | 17,474 | 2,220 | 435 |
Example: a 10 kW ground frame
For the loads of Dnipro: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Ivano-Mykhailivka5 km1,161 kWh/kWp
- Vsesviatske6 km1,168 kWh/kWp
- Yevetsko-Mykolaivka7 km1,171 kWh/kWp
- Popasne8 km1,162 kWh/kWp
- Cherkaske9 km1,175 kWh/kWp
- Novostepanivka9 km1,168 kWh/kWp
All places: Samarivskyi RaionDnipropetrovsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.