Solar power plant in Neustadt an der Weinstraße, Germany: yield, tilt angle and row spacing

Neustadt an der Weinstraße: 1,126 kWh per kWp a year at the optimal tilt of 37°, 3° east of south (PVGIS). 7.8% above the median of the main cities of Germany (1,045). #18 of 193 main cities of Germany by yield. For comparison, Kyiv: 1,114 kWh/kWp — 1.0% more here.

Neustadt an der Weinstraße is in Rhineland-Palatinate. Population 53,984 (GeoNames). 144 m above sea level. 27 km away: Ludwigshafen am Rhein, the nearest bigger city, 1,107 kWh/kWp — 1.7% more here. 11.51 m between rows, pitch 15.33 m, GCR 0.31 (latitude 49.4°).

Yield of 1 kWp
1,126kWh/year
Tilt
37°3° east of south
10 kW
11,256kWh/year
Row pitch
15.33m · GCR 0.31
Rank in the country
18of 193 cities

Ground frame designer

A ground frame for a solar plant: Neustadt an der Weinstraße

Latitude 49.4°: the tilt and the row pitch follow it. Enter the snow and wind for Germany in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan62Feb104Mar129Apr133May136Jun136Jul126Aug113Sep78Oct43Nov30Dec

June: 136 kWh/kWp, December: 30 — 4.5 times less.

March: 104 against the median of 92 for the main cities of Germany, 13.0% more.

Neustadt an der Weinstraße: plants, kWh
kWpA yearJuneDecember
55,628680150
1011,2561,360300
1516,8842,040450

Snow and wind loads

Snow and wind loads for a site in Germany follow DIN EN 1991-1-3/NA (snow load zone, Schneelastzone) and DIN EN 1991-1-4/NA (wind zone, Windzone). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Germany: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Germany: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.