Solar power plant in Kempten (Allgäu), Germany: yield, tilt angle and row spacing
Kempten (Allgäu): 1,162 kWh per kWp a year at the optimal tilt of 39°, 1° east of south (PVGIS). 11.2% above the median of the main cities of Germany (1,045). #2 of 193 main cities of Germany by yield. For comparison, Kyiv: 1,114 kWh/kWp — 4.3% more here.
Kempten (Allgäu) is in Bavaria. Population 61,399 (GeoNames). 681 m above sea level. 78 km away: Ulm, the nearest bigger city, 1,115 kWh/kWp — 4.2% more here. 10.73 m between rows, pitch 14.45 m, GCR 0.33 (latitude 47.7°).
- Yield of 1 kWp
- 1,162kWh/year
- Tilt
- 39°1° east of south
- 10 kW
- 11,615kWh/year
- Row pitch
- 14.45m · GCR 0.33
- Rank in the country
- 2of 193 cities
Ground frame designer
A ground frame for a solar plant: Kempten (Allgäu)
Latitude 47.7°: the tilt and the row pitch follow it. Enter the snow and wind for Germany in the designer, by the national annex to the Eurocode.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 129 kWh/kWp, December: 50 — 2.6 times less.
December: 50 against the median of 30 for the main cities of Germany, 66.7% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,808 | 645 | 250 |
| 10 | 11,615 | 1,290 | 500 |
| 15 | 17,423 | 1,935 | 750 |
Snow and wind loads
Snow and wind loads for a site in Germany follow DIN EN 1991-1-3/NA (snow load zone, Schneelastzone) and DIN EN 1991-1-4/NA (wind zone, Windzone). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Germany: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.
The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.
Nearby cities
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation, population and divisions (changed)
- Where to take snow and wind loads from: DIN EN 1991-1-3/NA, DIN EN 1991-1-4/NA
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.