Solar power plant in Gladbeck, Germany: yield, tilt angle and row spacing

Gladbeck: 1,015 kWh per kWp a year at the optimal tilt of 39°, 3° east of south (PVGIS). 2.8% below the median of the main cities of Germany (1,045). #145 of 193 main cities of Germany by yield. For comparison, Kyiv: 1,114 kWh/kWp — 8.9% less here.

Gladbeck is in North Rhine-Westphalia. Population 75,499 (GeoNames). 60 m above sea level. 7 km away: Bottrop, the nearest bigger city, the same 1,020 kWh/kWp. 14.37 m between rows, pitch 18.09 m, GCR 0.26 (latitude 51.6°).

Yield of 1 kWp
1,015kWh/year
Tilt
39°3° east of south
10 kW
10,149kWh/year
Row pitch
18.09m · GCR 0.26
Rank in the country
145of 193 cities

Ground frame designer

A ground frame for a solar plant: Gladbeck

Latitude 51.6°: the tilt and the row pitch follow it. Enter the snow and wind for Germany in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb90Mar116Apr124May122Jun122Jul113Aug97Sep71Oct43Nov29Dec

May: 124 kWh/kWp, December: 29 — 4.3 times less.

February: 53 against the median of 56 for the main cities of Germany, 5.4% less.

Gladbeck: plants, kWh
kWpA yearMayDecember
55,075620145
1010,1491,240290
1515,2241,860435

Snow and wind loads

Snow and wind loads for a site in Germany follow DIN EN 1991-1-3/NA (snow load zone, Schneelastzone) and DIN EN 1991-1-4/NA (wind zone, Windzone). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Germany: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Germany: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.