Germany: solar plant site data

Solar power plant in Bergheim, Germany: yield, tilt angle and row spacing

Bergheim: 1,065 kWh per kWp a year at the optimal tilt of 40°, 3° east of south (PVGIS). 2.0% above the median of the main cities of Germany (1,045). #66 of 193 main cities of Germany by yield. For comparison, Kyiv: 1,114 kWh/kWp — 4.4% less here.

Bergheim is in North Rhine-Westphalia. Population 63,558 (GeoNames). 67 m above sea level. 10 km away: Kerpen, the nearest bigger city, 1,072 kWh/kWp — 0.6% less here. 13.94 m between rows, pitch 17.60 m, GCR 0.27 (latitude 51.0°).

Yield of 1 kWp
1,065kWh/year
Tilt
40°3° east of south
10 kW
10,650kWh/year
Row pitch
17.60m · GCR 0.27
Rank in the country
66of 193 cities

Ground frame designer

A ground frame for a solar plant: Bergheim

Latitude 51.0°: the tilt and the row pitch follow it. Enter the snow and wind for Germany in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan59Feb95Mar120Apr128May126Jun125Jul116Aug102Sep76Oct47Nov33Dec

May: 128 kWh/kWp, December: 33 — 3.9 times less.

January: 40 against the median of 35 for the main cities of Germany, 14.3% more.

Bergheim: plants, kWh
kWpA yearMayDecember
55,325640165
1010,6501,280330
1515,9751,920495

Snow and wind loads

Snow and wind loads for a site in Germany follow DIN EN 1991-1-3/NA (snow load zone, Schneelastzone) and DIN EN 1991-1-4/NA (wind zone, Windzone). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Germany: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Germany: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.