Solar plant: site data
Solar power plant in Verbivtsi, Chernivetskyi Raion, Chernivtsi Oblast
Verbivtsi: 1,129 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.2% below the oblast median (1,143). #182 of 215 in the rayon, #310 of 422 in the oblast.
Chernivtsi, the rayon centre, is 23 km away. 314 m above sea level. 7 km away: Zastavna, the nearest bigger centre, the same 1,131. Snow and wind from the nearest regional centre in the DBN — Чернівці, 23 km. 10.82 m between rows, pitch 14.64 m (latitude 48.5°).
- Yield of 1 kWp
- 1,129kWh/year
- Tilt
- 37°1° east of south
- 10 kW
- 11,294kWh/year
- Row pitch
- 14.64m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,320 / 500Pa
Ground frame designer
A ground frame for a solar plant: Verbivtsi
The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 23 km: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 138 kWh/kWp, December: 35 — 3.9 times less.
November: 44 against 47 in the oblast, 6.4% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,647 | 690 | 175 |
| 10 | 11,294 | 1,380 | 350 |
| 15 | 16,941 | 2,070 | 525 |
Example: a 10 kW ground frame
For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.
How these numbers are computed
Nearby
- Yurkivtsi1 km1,137 kWh/kWp
- Boianchuk2 km1,138 kWh/kWp
- Malyy Kuchuriv3 km1,131 kWh/kWp
- Horoshivtsi5 km1,138 kWh/kWp
- Vaslovivtsi5 km1,136 kWh/kWp
- Zastavna7 km1,131 kWh/kWp
All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.