Solar plant: site data

Solar power plant in Vaslovivtsi, Chernivetskyi Raion, Chernivtsi Oblast

Vaslovivtsi: 1,136 kWh per kWp a year, tilt 38° 1° west of south (PVGIS). 0.6% below the oblast median (1,143). #160 of 215 in the rayon, #273 of 422 in the oblast.

Chernivtsi, the rayon centre, is 17 km away. 237 m above sea level. 10 km away: Zastavna, the nearest bigger centre, the same 1,131. Snow and wind from the nearest regional centre in the DBN — Чернівці, 18 km. 11.03 m between rows, pitch 14.80 m (latitude 48.4°).

Yield of 1 kWp
1,136kWh/year
Tilt
38°1° west of south
10 kW
11,361kWh/year
Row pitch
14.80m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Vaslovivtsi

The designer opens with this place’s coordinates, latitude 48.4° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 18 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

46Jan58Feb97Mar117Apr131May129Jun138Jul136Aug113Sep88Oct46Nov38Dec

July: 138 kWh/kWp, December: 38 — 3.6 times less.

February: 58 against 60 in the oblast, 3.3% less.

Vaslovivtsi: plants, kWh
kWpA yearJulyDecember
55,681690190
1011,3611,380380
1517,0422,070570

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.