Solar plant: site data

Solar power plant in Vasyliv, Chernivetskyi Raion, Chernivtsi Oblast

Vasyliv: 1,124 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.6% below the oblast median (1,143). #195 of 215 in the rayon, #331 of 422 in the oblast.

Chernivtsi, the rayon centre, is 36 km away. 149 m above sea level. 9 km away: Zastavna, the nearest bigger centre, 1,131 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 36 km. 10.90 m between rows, pitch 14.72 m (latitude 48.6°).

Yield of 1 kWp
1,124kWh/year
Tilt
37°1° east of south
10 kW
11,242kWh/year
Row pitch
14.72m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Vasyliv

The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 36 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan54Feb95Mar118Apr132May132Jun139Jul136Aug113Sep87Oct44Nov34Dec

July: 139 kWh/kWp, December: 34 — 4.1 times less.

February: 54 against 60 in the oblast, 10.0% less.

Vasyliv: plants, kWh
kWpA yearJulyDecember
55,621695170
1011,2421,390340
1516,8632,085510

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.