Solar plant: site data

Solar power plant in Doroshivtsi, Chernivetskyi Raion, Chernivtsi Oblast

Doroshivtsi: 1,104 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 3.3% below the oblast median (1,143). #213 of 215 in the rayon, #368 of 422 in the oblast.

Chernivtsi, the rayon centre, is 34 km away. 150 m above sea level. 8 km away: Zastavna, the nearest bigger centre, 1,131 — 2.4% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 34 km. 10.64 m between rows, pitch 14.51 m (latitude 48.6°).

Yield of 1 kWp
1,104kWh/year
Tilt
36°1° east of south
10 kW
11,044kWh/year
Row pitch
14.51m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Doroshivtsi

The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 34 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan55Feb95Mar119Apr131May132Jun140Jul136Aug113Sep87Oct41Nov22Dec

July: 140 kWh/kWp, December: 22 — 6.4 times less.

December: 22 against 37 in the oblast, 40.5% less.

Doroshivtsi: plants, kWh
kWpA yearJulyDecember
55,522700110
1011,0441,400220
1516,5662,100330

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.