Solar plant: site data
Solar power plant in Stavchany, Chernivetskyi Raion, Chernivtsi Oblast
Stavchany: 1,119 kWh per kWp a year, tilt 37° 1° west of south (PVGIS). 2.1% below the oblast median (1,143). #206 of 215 in the rayon, #347 of 422 in the oblast.
Chernivtsi, the rayon centre, is 31 km away. 235 m above sea level. 10 km away: Kitsman, the nearest bigger centre, 1,137 — 1.6% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 31 km. 10.83 m between rows, pitch 14.65 m (latitude 48.5°).
- Yield of 1 kWp
- 1,119kWh/year
- Tilt
- 37°1° west of south
- 10 kW
- 11,188kWh/year
- Row pitch
- 14.65m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,320 / 500Pa
Ground frame designer
A ground frame for a solar plant: Stavchany
The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 31 km: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 140 kWh/kWp, December: 33 — 4.2 times less.
January: 39 against 45 in the oblast, 13.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,594 | 700 | 165 |
| 10 | 11,188 | 1,400 | 330 |
| 15 | 16,782 | 2,100 | 495 |
Example: a 10 kW ground frame
For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.
How these numbers are computed
Nearby
- Malyatyntsi2 km1,126 kWh/kWp
- Yuzhynets3 km1,128 kWh/kWp
- Davydivtsi3 km1,134 kWh/kWp
- Khlivyshche5 km1,135 kWh/kWp
- Havrylivtsi5 km1,136 kWh/kWp
- Shyshkivtsi6 km1,126 kWh/kWp
All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.