Solar power plant in Serhiyi, Vyzhnytskyi Raion, Chernivtsi Oblast

Serhiyi: 1,118 kWh per kWp a year, tilt 40° 8° east of south (PVGIS). 2.2% below the oblast median (1,143). #31 of 94 in the rayon, #349 of 422 in the oblast.

Vyzhnytsya, the rayon centre, is 29 km away. 913 m above sea level — above 500 m the DBN snow and wind are higher. 29 km away: Vyzhnytsya, the nearest bigger centre, 1,076 — 3.8% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 67 km. 11.16 m between rows, pitch 14.82 m (latitude 48.0°).

Yield of 1 kWp
1,118kWh/year
Tilt
40°8° east of south
10 kW
11,177kWh/year
Row pitch
14.82m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Serhiyi

The designer opens with this place’s coordinates, latitude 48.0° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 67 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

61Jan70Feb97Mar104Apr112May112Jun124Jul122Aug106Sep91Oct66Nov53Dec

July: 124 kWh/kWp, December: 53 — 2.3 times less.

December: 53 against 37 in the oblast, 43.2% more.

Serhiyi: plants, kWh
kWpA yearJulyDecember
55,589620265
1011,1771,240530
1516,7661,860795

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed