Solar plant: site data

Solar power plant in Moshanets, Dnistrovskyi Raion, Chernivtsi Oblast

Moshanets: 1,140 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). Exactly the oblast median (1,143). #88 of 113 in the rayon, #235 of 422 in the oblast.

Kelmentsi, the rayon centre, is 10 km away. 150 m above sea level. 10 km away: Kelmentsi, the nearest bigger centre, 1,148 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 59 km. 10.80 m between rows, pitch 14.62 m (latitude 48.5°).

Yield of 1 kWp
1,140kWh/year
Tilt
37°1° east of south
10 kW
11,404kWh/year
Row pitch
14.62m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Moshanets

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 59 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan52Feb96Mar120Apr135May135Jun143Jul140Aug116Sep89Oct44Nov33Dec

July: 143 kWh/kWp, December: 33 — 4.3 times less.

January: 37 against 45 in the oblast, 17.8% less.

Moshanets: plants, kWh
kWpA yearJulyDecember
55,702715165
1011,4041,430330
1517,1062,145495

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Dnistrovskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.