Solar plant: site data
Solar power plant in Bernove, Dnistrovskyi Raion, Chernivtsi Oblast
Bernove: 1,138 kWh per kWp a year, tilt 36° facing south (PVGIS). Exactly the oblast median (1,143). #98 of 113 in the rayon, #254 of 422 in the oblast.
Kelmentsi, the rayon centre, is 15 km away. 136 m above sea level. 15 km away: Kelmentsi, the nearest bigger centre, 1,148 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 56 km. 10.57 m between rows, pitch 14.44 m (latitude 48.5°).
- Yield of 1 kWp
- 1,138kWh/year
- Tilt
- 36°facing south
- 10 kW
- 11,377kWh/year
- Row pitch
- 14.44m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,320 / 500Pa
Ground frame designer
A ground frame for a solar plant: Bernove
The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 56 km: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 142 kWh/kWp, December: 33 — 4.3 times less.
January: 38 against 45 in the oblast, 15.6% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,689 | 710 | 165 |
| 10 | 11,377 | 1,420 | 330 |
| 15 | 17,066 | 2,130 | 495 |
Example: a 10 kW ground frame
For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.
How these numbers are computed
Nearby
- Sokil4 km1,134 kWh/kWp
- Hrynchuk4 km1,137 kWh/kWp
- Moshanets5 km1,140 kWh/kWp
- Perkivtsi6 km1,137 kWh/kWp
- Konovka6 km1,138 kWh/kWp
- Voronovytsya6 km1,138 kWh/kWp
All places: Dnistrovskyi RaionChernivtsi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.