Solar plant: site data

Solar power plant in Yeline, Koriukivskyi Raion, Chernihiv Oblast

Yeline: 1,075 kWh per kWp a year, tilt 39° 3° east of south (PVGIS). 3.0% below the oblast median (1,108). #209 of 220 in the rayon, #1500 of 1558 in the oblast.

Koryukivka, the rayon centre, is 33 km away. 124 m above sea level. 33 km away: Koryukivka, the nearest bigger centre, 1,085 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 76 km. 14.96 m between rows, pitch 18.68 m (latitude 52.0°).

Yield of 1 kWp
1,075kWh/year
Tilt
39°3° east of south
10 kW
10,746kWh/year
Row pitch
18.68m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Yeline

The designer opens with this place’s coordinates, latitude 52.0° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 76 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan59Feb97Mar113Apr135May139Jun136Jul133Aug106Sep69Oct28Nov25Dec

June: 139 kWh/kWp, December: 25 — 5.6 times less.

November: 28 against 33 in the oblast, 15.2% less.

Yeline: plants, kWh
kWpA yearJuneDecember
55,373695125
1010,7461,390250
1516,1192,085375

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Koriukivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.