Solar plant: site data

Solar power plant in Pustynky, Chernihivskyi Raion, Chernihiv Oblast

Pustynky: 1,080 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). 2.5% below the oblast median (1,108). #424 of 479 in the rayon, #1421 of 1558 in the oblast.

Chernihiv, the rayon centre, is 45 km away. 105 m above sea level. 45 km away: Chernihiv, the nearest bigger centre, 1,105 — 2.3% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 45 km. 13.88 m between rows, pitch 17.65 m (latitude 51.4°).

Yield of 1 kWp
1,080kWh/year
Tilt
38°3° east of south
10 kW
10,801kWh/year
Row pitch
17.65m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Pustynky

The designer opens with this place’s coordinates, latitude 51.4° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 45 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan55Feb95Mar115Apr133May139Jun136Jul133Aug108Sep74Oct32Nov24Dec

June: 139 kWh/kWp, December: 24 — 5.8 times less.

May: 133 against 139 in the oblast, 4.3% less.

Pustynky: plants, kWh
kWpA yearJuneDecember
55,401695120
1010,8011,390240
1516,2012,085360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.