Solar plant: site data
Solar power plant in Khrapate, Chernihivskyi Raion, Chernihiv Oblast
Khrapate: 1,076 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). 2.8% below the oblast median (1,108). #439 of 479 in the rayon, #1471 of 1558 in the oblast.
Chernihiv, the rayon centre, is 42 km away. 116 m above sea level. 42 km away: Chernihiv, the nearest bigger centre, 1,105 — 2.6% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 42 km. 13.93 m between rows, pitch 17.70 m (latitude 51.5°).
- Yield of 1 kWp
- 1,076kWh/year
- Tilt
- 38°3° east of south
- 10 kW
- 10,764kWh/year
- Row pitch
- 17.70m · GCR 0.27
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Khrapate
The designer opens with this place’s coordinates, latitude 51.5° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 42 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 138 kWh/kWp, December: 25 — 5.5 times less.
August: 132 against 138 in the oblast, 4.3% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,382 | 690 | 125 |
| 10 | 10,764 | 1,380 | 250 |
| 15 | 16,146 | 2,070 | 375 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.
How these numbers are computed
Nearby
- Tsentralne2 km1,077 kWh/kWp
- Mnov3 km1,086 kWh/kWp
- Hliadyn3 km1,077 kWh/kWp
- Pustynky5 km1,080 kWh/kWp
- Rudnia5 km1,076 kWh/kWp
- Zavod6 km1,076 kWh/kWp
All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.